Constructive process

STAGE 1: PLOT OF LAND

  • Size and shape of the project design
  • Edge Path field
  • First on the visual project, a two-dimensional

STAGE 2 : EXCAVATION

  • Evacuation Earth
  • Given the path marked on the perimeter , inclination and depth of the project design
  • Regularization of the land to allow the elevation of the structure on a stable surface.

STAGE 3 : PERIMETER FRAME

  • The structure of corrugated iron bar mounted inside the excavation or delineation.
  • Serve as a jute backing

STAGE 4 : CREATING A GRAVEL BASE

  • A layer of gravel that underlies soil or background extends
  • Helps combat uneven terrain and improve the depth

5th STAGE: ENCOFRADO. JUTE

  • Sufficient strength to withstand the projection of shotcrete.( constructive peculiarity Piscinas Mijas )
  • Outline the perimeter inner structure of natural jute 22x22cm defining the form and shape of the pool

6th STAGE: steel reinforcement

  • Defines the thickness of the vessel walls.
  • Iron Lace and assembly

7th STAGE: PLUMBING PREINSTALLATION

  • PVC pipes are placed , and flexible rubber tubes for the circulation of water through the installation
  • Accessories pools built in the architectural structure of the vessel ( eg background , skimmers … )
  • Ground Lead

8th STAGE: SHOTCRETE

  • Shotcrete.
  • Filling the steel reinforcement
  • Surface resistant padding to the terms of use of the pool .

9th STAGE: SET TOP

  • On the walls of the vessel
  • Combination of white cement and marble dust
  • Separate with court rules or radial compaction after

10th STAGE: COATING ( gressite )

  • From the inner surface of the vessel
  • When fully subject Lechea
  • Cosmetic application process

11th STAGE: FINAL INSTALLATION OF PLUMBING

  • The physical cycle the chemical cycle. Purification equipment (motor, filter, and plumbing and electrical panel )
  • Chemical Dosing Pumps also fed cycle box and connected to a drum
  • Casetón fiber or engine room

12th STAGE: SET ACCESSORIES

  • Enable all ports Pool
  • Termination elements and accessories for use and access
  • Stairs , showers, termination elements , skimmers , bottom , drives, spa items , etc.

13th STAGE: START-UP

  • Cleaning the glass , granite , and engine room
  • Filling
  • Control of the installation prior to commissioning
  • Filling the filter with siliceous sand
  • Priming pump operation and put